Update Letter

Dear Members of Association,

The Association is in the process of the new carpet installation. More than 43,000 sq. ft. of carpet has already been installed on 27 floors. The project is expected to be completed by March 15th, 2014.  The installation of the marble in the elevator lobbies will begin on April 1st, 2014 and will take approximately 10 days per floor. On the Association’s website, you shall be able to see how our hallways looked before and after the new carpet.
Our twelve years old, building’s roof, has faced various leaks in the last two years and consequently needed serious attention.  The roof restoration project began on March 1st, 2014 and should be completed by April 15th, 2014.
All of the above mentioned projects did not require any special assessment and have been financed from the yearly savings.

La Asociación está en el proceso de instalación de nueva alfombra. Más de 43,000 pies cuadrados de alfombra ya se han instalado en 27 pisos. Esperamos que el proyecto se termine el 15 de Marzo, 2014. La instalación del mármol en los vestíbulos de los ascensores comenzará el 1 de Abril, 2014 y tomará aproximadamente 10 días por piso. En el portal internet de la Asociación, podrá de ver cómo se veían nuestros pasillos parecían antes y después con la nueva alfombra.
El techo de doce años de nuestro edificio, tiene y ha enfrentado diversas filtraciones en los últimos dos años y por lo que necesita una atención seria. El proyecto de restauración del techo comenzó el 1 de Marzo, 2014 y debe ser completado para el 15 de Abril, 2014.
Todos los proyectos mencionados no requirieron ninguna cuota extraordinaria especial y se han financiado  los ahorros anuales de la asociación.

Gregory Arzumanov