Projects

  • Swimming Pool

    Ladies and Gentlemen,, As I have reported, our swimming pool was maintained poorly for many years, causing irreparable damage to the expensive equipment as well as to the pool walls. […]

  • New Flooring

    Ladies and Gentlemen, In the month of February, 2015 the Association completed the New carpet installation project which cost $243,000 and was the most expensive project this year. More than […]

  • Jacuzzi Restoration

    Dear Residents, In order to keep our world-class amenities in the perfect conditions, the Hot Tub/Jacuzzi was resurfaced with the diamond bright. Also, new tiles, jets and light were installed. […]

  • For the handicapped…

    The Association installed the automatic door on the way to the swimming pool and related door controls to help those handicapped and others who need assistance through doors with side […]

  • Building painting

    Dear Residents: Please be advised that we have good news for you – the Board of Directors has signed a contract with Capital Painting to pressure clean, waterproof and paint […]

  • Heat Pump replaced

    The heat pump is responsible for delivering fresh air to our fitness center and aerobics room, as well as our entire air conditioning system. Yearly poor maintenance of the heat […]

  • Front and Backyard

    From August to September 2009, the brick parking space in front of our building, the backyard picnic area, and the swimming pool areas were cleaned with a high water pressure […]

  • Lobby from Andriana Hoyos

    Adriana Hoyos is a natural-born designer enriching the everyday life with her passion for timeless design and sophistication. She is a perfectionist – always delivering a memorable experience accompanying her […]